Skip to content
Normally ClosedStainless Steel BodyJIS Rc Screwed

Yoshitake PD-3 Air Operated Valve

Yoshitake PD-3 air operated ON-OFF valve. Features a stainless steel body, PTFE disc, and compact actuator for steam, air, water, and oil up to 200°C.

Yoshitake PD-3 Air Operated Valve

Yoshitake PD-3 is an air-operated ON-OFF valve designed for a wide range of fluids, applications, and ambient conditions. Featuring a compact design and high durability, this automated control valve utilizes a stainless steel cast body and a metal actuator. It is suitable for steam, air, cold and hot water, oil, and other non-dangerous fluids (600 cSt or less) at temperatures ranging from -30°C to 200°C. The PD-3 is normally closed (pressure to open) and allows for a wide variety of actuators to be used for low pilot pressures, reducing overall costs.

Features

  • Compact design and high durability.
  • Stainless steel cast body and metal actuator are suitable for a wide range of fluids, applications, and ambient conditions.
  • Wide variety of actuators can be used for low pilot pressure.

Yoshitake PD-3 Air Operated Valve exterior view

Specifications

SpecificationValue
ApplicationSteam, Air, Cold and hot water, Oil, Other non-dangerous fluids (600 cSt or less)
Nominal size15A to 50A
Temperature range-30 to 200°C (no freeze condition)
Ambient temperature-15 to 60°C
Installation postureAny direction is possible
ConnectionJIS Rc screwed
OperationNormally closed (pressure to open) Available with normally open type

Working and Pilot Pressures

  • 15A: Working 0-2.2 MPa (Max 1.5 MPa for steam) / Pilot 0.35-1.0 MPa
  • 20A: Working 0-1.3 MPa / Pilot 0.45-1.0 MPa
  • 25A: Working 0-0.9 MPa / Pilot 0.57-1.0 MPa OR Working 0-2.2 MPa / Pilot 0.35-1.0 MPa
  • 32A: Working 0-1.2 MPa / Pilot 0.35-1.0 MPa
  • 40A: Working 0-1.0 MPa / Pilot 0.44-1.0 MPa
  • 50A: Working 0-0.75 MPa / Pilot 0.56-1.0 MPa

Dimensions and Weights

SizedL (mm)A (mm)H (mm)B (mm)D (mm)GWeight (kg)
15ARc 1/26513513034.562G 1/8"1.1
20ARc 3/47514013534.562G 1/8"1.2
25ARc 19015014034.562G 1/8"1.4
25A (High Press.)Rc 1901901855596G 1/4"3.0
32ARc 1-1/41102052005596G 1/4"3.3
40ARc 1-1/21202102055596G 1/4"3.6
50ARc 21502252155596G 1/4"4.2

Structure and Materials

Yoshitake PD-3 structural drawing and parts list

No.Parts NameMaterial
1BodyCast Stainless Steel (SCS14A eq.)
2Packing caseCast Stainless Steel (SCS14A eq.)
3GasketGraphite
5Valve discPTFE
20BonnetBrass (Cu Zn 40 Pb 2 / C3771 eq.) + Chrome plating
22CirclipSteel nickel plated
23PistonBrass (Cu Zn 39 Pb3 / C3603 eq.)
24Exterior lip sealFKM
26Spring for pistonSpring steel
27Position indicatorPA6

Operation

1. Closing operation (normal state) When pilot pressure is not applied, the valve disc [5] is closed by the power of the spring [26]. Yoshitake PD-3 closing operation diagram

2. Opening operation When pilot pressure is applied from the pilot port, pressure is added to the bottom part of the piston [23], overcoming the load of the spring [26] to push up the piston [23] and open the valve disc [5]. The position indicator [27] connected to the piston [23] is pushed up at the same time, allowing the valve opening to be checked visually from the outside. Yoshitake PD-3 opening operation diagram

Installation and Piping

Yoshitake PD-3 piping installation example

Installation Precautions

  • Before installing the product in piping, be sure to remove foreign substances and scale from the piping.
  • Check the direction of the product so that the fluid flowing and the arrow marked on the product are in the same direction.
  • Connect the product to piping securely so that fluid cannot leak. If using a seal agent, prevent it from commingling into the product.
  • Install pipes so that excessive load, torque, or vibration cannot be applied to the product.
  • When connecting the product to piping, grasp the hexagonal part of the inlet and outlet sides of the body with a tool. Do not screw the product into piping by grasping the actuator part.

Piping Recommendations

  • Be sure to install a strainer (60 mesh or equivalent) at the inlet side of the product.
  • Install a stop valve and bypass piping for the product to allow for maintenance and inspection.
  • Compressed air supplied to the actuator should be clean and dry air without commingling of water, oil, or foreign substances.

Minimum Maintenance Space

Yoshitake PD-3 minimum maintenance space diagram

SizeH1 (mm)L2 (mm)
15A200200
20A210210
25A220220
32A280280
40A290290
50A310310

Maintenance and Troubleshooting

Warning for Operation and Maintenance

  • Do not touch the product with bare hands in case of high-temperature fluid to avoid scalds.
  • When conducting disassembly or inspection, be sure to discharge the inner pressure of the product, piping, and equipment, and cool down the body of the product until it can be touched by bare hands.

Regular Inspection

  • Leakage check (visual check) with conducting open and closing operation: More than once a year
  • Leakage check (visual check) from leak detection port: More than once a year
  • Leakage check (visual check) from position indicator: More than once a year
  • Consumable parts: The Gasket [3] has a rough replacement term of 3 years.

Troubleshooting

TroubleCauseRemedy
Fluid does not flow (Valve disc is kept closing and does not open)Pilot pressure is not supplied or is low.Check air supply piping and apply specified pilot pressure.
Sealing defect of outer lip seal [24].Replace the actuator set.
Fluid keeps flowing, does not stop (Valve disc is kept opening and does not close) or valve leakageLeakage from stop valve on bypass piping.Close stop valve or replace it.
Pilot pressure exists inside the bonnet.Remove pilot pressure from pilot port.
Foreign substance is stuck on the seat part between valve disc [5] and body [1].Clean the seat part.
Damage on the seat part between valve disc [5] and body [1].Replace the actuator set (if disc is damaged) or the product (if body seat is damaged).
Defect of spring [26] inside actuator.Replace the actuator set.
Fluid leaks from the connection part of packing case [2] and body [1]Leakage from gasket due to loose packing case [2] or deterioration.Tighten packing case [2] to specified torque or replace gasket [3].
Fluid leaks from leak detection port or pilot pressure leaks from position indicatorLeakage due to deterioration of O-ring or packing inside the actuator set.Replace the actuator set.

Disassembly and Reassembly

Yoshitake PD-3 exploded view for disassembly

Disassembly Warning

Be sure not to remove circlip [22]. Failure to follow this notice makes the inner spring [26] fly out and result in injury. To remove or install the actuator set from the body [1], supply pilot pressure to the pilot port to raise the valve disc [5]. Then loosen/tighten the actuator set by grasping the hexagonal part of the packing case [2]. Do not stop pilot pressure during this work.

To install the actuator set on the body, tighten so that appropriate pressure can be applied on the gasket [3] with a torque wrench.

SizeTightening Torque
15A60 Nm
20A90 Nm
25A120 Nm
32A150 Nm
40A190 Nm
50A230 Nm

Yoshitake Control Valves / Automated Control Valves

CT, HN, MD, and PD series motorized and pneumatic control valves for automated regulation.

Discuss Yoshitake Control Valves / Automated Control Valves