Skip to content
Free FloatPneumatic Bypass BlowdownX-elementStainless Steel

TLV J3S-X-PB Free Float Steam Trap with Pneumatic Bypass Blowdown

TLV J3S-X-PB stainless steel free float steam trap with a built-in pneumatically actuated bypass blowdown valve. Features an X-element thermostatic air vent for rapid start-up.

TLV J3S-X-PB Free Float Steam Trap with Pneumatic Bypass Blowdown

TLV J3S-X-PB is a reliable and durable stainless steel free float steam trap that includes a built-in bypass valve with a pneumatic actuator to facilitate discharge of the large quantities of condensate produced at start-up by process equipment, heaters, air conditioners, tank heating, etc.

A tight-sealing pneumatically operated ball valve incorporated into the cover enables remote execution of bypass blowdown to reduce start-up times. The self-modulating free float provides continuous, smooth, low velocity condensate discharge as process loads vary. The precision-ground float, constant water seal and three-point seating design ensure a steam tight seal, even under no-load conditions. The thermostatic capsule (X-element) with "fail open" feature vents air automatically until close-to-steam temperature.

Specifications

Steam Trap

ModelJ3S-X-PB
ConnectionScrewed | Flanged
Size1/2", 3/4", 1" | DN 15, 20, 25
Orifice No.2, 5, 10
Maximum Operating Pressure (PMO)0.2, 0.5, 1.0 MPaG (2, 5, 10 barg)
Maximum Differential Pressure (ΔPMX)0.2, 0.5, 1.0 MPa (2, 5, 10 bar)
Maximum Operating Temperature (TMO)185 °C
Subcooling of X-element FillUp to 6 °C
Type of X-elementC6

Actuator Unit

Actuator TypeVane rotary actuator
Air Supply Pressure0.3 to 1.0 MPaG (3 to 10 barg)
Air Supply Port SizeRc(PT) 1/8
Control SystemON-OFF (fully open/fully closed) reciprocating
Open/Close Time (90° rotation)0.09 - 0.8 seconds
Actuator Capacity42 cm³
Ambient Temp. Range60 °C or lower
Water ResistanceRainproof
Manual OverridePossible in absence of motive air pressure

Operation

  1. Initial Air and Cold Condensate Discharge At startup, before steam is supplied, the trap is cold so the X-element is contracted and the air vent valve seat (A) is open. This allows for the rapid discharge of air through the air vent valve (A) and cold condensate through the orifice (B), when steam is first supplied to the system. Initial air/condensate can be discharged rapidly using the bypass blowdown valve as necessary. TLV J3S-X-PB Initial Air and Cold Condensate Discharge

  2. Condensate Discharge After the discharge of initial air and cold condensate (bypass blowdown valve closed), the heat of the inflowing steam and condensate causes the X-element to expand, closing the air vent valve (A). The rising condensate level causes the float to rise due to buoyancy, opening the orifice (B) and allowing condensate to be discharged. TLV J3S-X-PB Condensate Discharge

  3. Hot Air Discharge Should hot air flow into the trap with the steam during normal operation, the temperature of the X-element drops, causing it to momentarily contract and open the air vent valve (A), which allows for the rapid discharge of the air. After the air is discharged and steam contacts the X-element, the temperature will increase causing the air vent valve (A) to close. TLV J3S-X-PB Hot Air Discharge

  4. Closed Position When the condensate flow rate decreases, the float falls as condensate is discharged, closing off the orifice (B). A water seal is maintained at all times over the orifice (B) to prevent steam loss. TLV J3S-X-PB Closed Position

Dimensions

Screwed

TLV J3S-X-PB Screwed Dimensions

SizeL (mm)H (mm)H1 (mm)W (mm)W1 (mm)Weight (kg)
1/2"12031824089.5794.0
3/4"19031824089.5794.5
1"20031824089.5794.7

Flanged

TLV J3S-X-PB Flanged Dimensions

DNL (DIN 2501 PN16)L (ASME 150RF)L (ASME 300RF)H (mm)H1 (mm)φW1 (mm)Weight (kg)
15170175175318240794.2
20170195195318240794.8
25180215219318240795.8

Capacities

Discharge Capacity (Steam Trap)

TLV J3S-X-PB Discharge Capacity

WARNING

DO NOT use this product under conditions that exceed maximum differential pressure, as condensate backup will occur!

Bypass Capacity (Ball Valve)

TLV J3S-X-PB Bypass Capacity

Installation and Operation

WARNING

Install properly and DO NOT use this product outside the recommended operating pressure, temperature and other specification ranges. Improper use may result in such hazards as damage to the product or malfunctions which may lead to serious accidents.

Air Supply Piping/Operation

  1. Use only clean air, which has been run through an air trap, filter, oiler, etc.
  2. Make sure there is no foreign matter, particularly dirt or sealing tape, in the pneumatic actuator.
  3. The table below shows the relationship between the air supply and valve opening/closing.
Port: APort: BValve
SupplyExhaustOpen
ExhaustSupplyClosed
  1. When checking operation of the pneumatic actuator before installation, keep fingers well clear of the bypass blowdown valve section.
  2. Carry out an operational check of the actuator under no-load conditions (no pressure) before actual operation to ensure that the air is supplied properly. The "Open/Closed" Indicator located in the lower part of the actuator indicates whether the valve is open/closed.
  3. Make sure that the integrated ball valve is closed at start-up, causing the product to function as a trap.
  4. To use the bypass function, supply air through port A and exhaust the air in the actuator through port B. The integrated ball valve will open.
  5. To stop using the bypass function, supply air through port B and exhaust the air in the actuator through port A. The integrated ball valve will close.
  6. The integrated ball valve should be closed when the product is used as a trap.

Manual Operation

  1. Perform manual operation only after shutting off the air supply first and making sure there is no pressure remaining inside the actuator unit. Manual operation can not be performed if there is pressure remaining inside the actuator unit.
  2. Grasp the manual operation key on the top of the actuator unit with a wrench, and turn in the direction of the arrows (distance across flats: 10 mm (3/8 in)).

Maintenance

Operational Check of the Actuator Unit and Bypass Valve Section

  1. An operational check shall be performed at least once every 6 months.
  2. Making sure there is air supplied to the actuator, check the operation (angle of rotation, time required to open/close the valve, sound).
  3. After shutting off the air supply, manually operate the valve, check for foreign matter in the valve and confirm torques.
Tightening Torque N·mNo load0.5 MPaG load1.0 MPaG load
0.40.50.6

Additional Tightening of the Valve Unit Gland Section

It is possible to further tighten the gland section in the J3S-X-PB valve units.

  1. Detach the actuator unit.
  2. Follow the steps given below to apply additional tightening.
    1. Loosen the holder screw.
    2. Tighten the gland holder further in with a socket wrench.
    3. Retighten the holder screw.

TIP

Do not tighten the gland holder completely the first time. Do not tighten it any more than necessary to stop leakage. If leakage continues even after applying additional tightening to the gland holder, replace parts.